
Installation of an Acrow Bridge on the Great East Road- Chinyunyu area following the wash-away of a culvert due to heavy rainfall.
Works are expected to be completed today in readiness for the flow of traffic which has been stuck on both ends.
Only smaller vehicles and trucks with less than 10 tonnage weight have been able to use a detour .
